JUST THE
FACTS! |
|
CONCRETE PAD & BERMS VS FPI DOCS |
| *
PERMANENT NON MOVABLE |
*
RELOCATABLE BY DESIGN |
| * POROUS
MATERIALS (POSSIBLE RCRA
PROBLEM) |
*
IMPERMEABLE STEEL CONSTRUCTION |
| *
ENGINEERING COST |
*
NO ENGINEERING COST REQUIRED |
| * SIZE
CONSTRAINTS. ONCE BUILT YOUR STUCK WITH THAT LOCATION AND SIZE |
*
MODULAR DESIGN EASILY GROWS WITH YOUR
NEEDS |
| * LONG
LEAD TIME |
*
SHORT LEAD TIME |
| *
CONSTRUCTION COSTS, PERMITS, etc, etc, etc |
*
NO CONSTRUCTION COSTS MINIMUM FIELD ASSEMBLY |
| * FLAT
DRIVE IN SUMP TRACKS CONTAMINATION OUTSIDE OF BERM |
*
ELEVATED GRATING ABOVE SUMP, NO TRACKING OF CONTAMINANTS OUTSIDE SUMP |
*
SUSCEPTIBLE TO GROUND FRACTURES. DUE TO
EARTH MOVEMENT |
*
SEISMICALLY PROTECTED |
| * LINERS
AND OR SPECIALIZED COATINGS NEEDED TO RESTRICT GROUND WATER CONTAMINATION |
*
NO LINERS OR SPECIALIZED COATINGS NEEDED |
| |
|